Project Location and Industry Background
Located in the South Pacific, New Caledonia is a French overseas “sui generis collectivity.” With the continuous expansion of the local nickel mining industry and the construction of urban power distribution networks, the demand for trenchless horizontal directional drilling has been rising year by year. Traditional excavation methods can easily damage the ecosystem of coral reef lagoons, making trenchless directional drilling the preferred solution for local municipal pipeline installation.
We undertook this directional drilling technical service project for a PE power pipeline in the town of Bouloupari, New Caledonia. The client, a local power construction company, had limited hands-on experience with Chinese machinery and required technical training and on-site construction guidance to support the development of the local underground power grid.
Multiple Construction Challenges in the Project
· Limited hands-on experience with the equipment among the construction team: The client’s crew had little practical experience with horizontal directional drilling and required training in rig operation, directional control, and pipe welding;
· Cross-border language barriers: Local staff primarily speak French but can communicate in English, while our technical and business personnel use English.
· Complex river crossing conditions: Drilling must reach a depth of 9 meters within a horizontal distance of 30 meters. The client’s original construction trajectory plan failed to meet these requirements, necessitating an urgent re-optimization of the guidance route upon arrival;
· Challenges in personnel safety management: Local construction workers lack uniform operating standards, and teamwork among crews is insufficient, making them highly prone to quality and safety incidents such as borehole collapses, drill pipe damage, and welding leaks.
Core Project Service Objectives
Provide one-stop on-site training in drill rig operation, directional control calibration, drilling fluid formulation, and PE pipe heat fusion welding; rapidly establish a local directional drilling team capable of independent operations; transfer proven domestic trenchless construction technologies; and support the localization of overseas infrastructure construction.

Construction Process, On-Site Operations, and Skills Training
Construction Process
The total length of the project’s main pipeline is 238 meters, divided into three sections for the differentiated installation of multi-specification PE power conduits to meet the municipal multi-circuit power supply requirements:
Section 1: 128 m (5 days): Complete the full construction of the first 128-meter section of the pipeline. Conduct on-site re-surveying of the terrain, identify underground utilities and geomagnetic interference, and re-optimize the guidance trajectory; Completed comprehensive maintenance and commissioning of the ZT-16 directional drilling rig, guidance system, and mud systems; drilled the pilot hole while strictly controlling drill pipe curvature; conducted six-stage reaming from 200 to 600 mm, while simultaneously providing hands-on training in rig operation, directional control calibration, and PE pipe heat fusion welding.
Second Section, 60 m (2 days): Completed the directional drilling and reaming operations for the 60-meter second section of the pipeline. Reused the proven construction trajectory, focusing on reinforcing training for the novice crew regarding mud mix ratios and in-hole torque monitoring. Standardized welding procedures—including pipe fusion temperature, pressure holding, and cooling—to address operational shortcomings among local personnel.
Third Section, 50 m (1 day): Leveraging the operational experience gained from the first two sections, we streamlined the survey and preparation processes to rapidly complete the 50-meter pipe steering and reaming operations. All three pipeline sections passed construction acceptance inspections, successfully completing the entire 238-meter PE power pipeline pre-buried crossing.


Standardized Construction Guidelines for Four Key Roles Ensure Overseas Project Quality
Clear operational standards were established for trainees with limited hands-on experience to reduce the likelihood of errors during overseas construction:
1. Driller: Prioritizing safety, standardizing drill rig operation techniques, and improving overall drilling efficiency;
2. Directional Drilling Position: Strictly control the bending radius of the drill pipe to prevent equipment wear and borehole deviation caused by excessive angles;
3. Welding Position: Uniformly control weld joint flatness, hot-melt temperature, and heating and cooling durations to eliminate pipeline leaks at the source;
4. On-site Coordination: Flexibly allocate work crews based on local personnel’s operational habits to avoid human-induced project delays.
One-Stop Overseas Directional Drilling Technical Services: Empowering Clients Through Global Technology Transfer
Dual-Role On-Site Service Model (Business + Technical)
Overseas project communication and equipment commissioning proceed in parallel, utilizing a dual-role on-site deployment model with both business and technical personnel. Upon arrival, we conduct a comprehensive inspection of the client’s existing drilling equipment, identify operational shortcomings and long-term construction needs, and combine professional technical guidance with business coordination to quickly build trust with overseas clients.
Full-Process, Unrestricted Technology Transfer
Unlike simple equipment guidance, this project provides end-to-end technical support covering preliminary surveying, design planning, equipment commissioning, directional drilling, mud formulation, pipe welding, and emergency troubleshooting. Upholding a service philosophy centered on mutual benefit, we fully transfer China’s proven HDD construction expertise through hands-on, on-site training, helping overseas teams rapidly master core trenchless construction techniques. This enables clients to perform construction independently, achieving a mutually beneficial partnership.
Overseas Directional Drilling Construction Safety Management Plan to Mitigate Cross-Border Project Risks
Establishing a Dedicated Safety Management System for Overseas Projects
Immediately upon project commencement, we establish a tiered safety management system that clearly defines responsibilities for on-site management, equipment operation, and safety supervision. We standardize safety briefings and information dissemination processes, conduct daily pre-construction safety briefings, and ensure safety controls cover all stages of the process—including drilling, reaming, and pullback.
Customized Construction Emergency Response Plans
Tailored emergency response plans are developed to address issues commonly encountered by novice overseas construction teams, such as drill bit jamming and borehole collapse. Key data—including in-bore torque, mud pressure, and drilling depth—are monitored in real time throughout the construction process to anticipate various operational failures in advance. Proven remedial procedures are pre-established to significantly reduce the high financial losses associated with rework and scrap material in overseas projects.
Core Principles of Safe Construction
Regardless of project deadlines or the complexity of construction conditions, construction safety is an absolute priority. All on-site operations and personnel training strictly adhere to safety regulations.

Project Summary: Taking Trenchless Technology Overseas to Unlock New Opportunities in Overseas Pipeline Engineering
Project Outcomes
Three trenchless river crossings were successfully completed within ten days, with the one-time installation of a total of 238 meters of multi-specification PE power pipelines. The client’s construction team progressed from initial operational inexperience to independently completing the full set of horizontal directional drilling (HDD) procedures by the end of the project; their professional technical services were highly recognized by the local construction team.
Industry and Corporate Value Generated by the Project
· A Benchmark Case for Overseas Technology Expansion: Enriched the portfolio of practical overseas HDD construction cases for China, validating the suitability of domestically developed trenchless technology for infrastructure projects in the South Pacific;
· Expanding Overseas Cooperation Channels: Purely on-site technical assistance has earned deep trust from overseas clients, laying the groundwork for future pipeline project collaborations in French-speaking regions and the South Pacific;
· Refining the Overseas Service System: We have accumulated comprehensive practical experience in cross-language construction, crew training, complex river crossings, and overseas safety management, thereby optimizing standardized processes for overseas technical services.
Industry Development Outlook
Currently, demand for urban pipeline network upgrades continues to grow globally, and the market for overseas trenchless pipeline projects offers vast potential. Building on the cross-border construction experience gained from this New Caledonia PE pipeline project, we will continue to provide mature HDD technical services, helping domestic trenchless construction technologies expand into international markets and offering professional, comprehensive HDD solutions for global municipal power, water supply, and wastewater pipeline construction.