Project Overview A 204-meter electrical pipeline project in Riyadh deployed the ZT-75/150AT rock drilling rig as the primary equipment. The project required the construction of two guidance holes, and the ZT-75/150AT rig accomplished two smooth ...
View More
A 150-meter communication pipeline installation project adopted the ZT-42 horizontal directional drilling rig as the core equipment. The project required laying a PE110mm × 5-hole pipeline, and the ZT-42 rig’s performance parameters fully matched t...