2022 XZ360E
There are two 2022 XCMG 360E HDD rigs.
Certified pre‑owned HDD rigs with full inspection reports, maintenance history, and warranty options. Cost‑effective entry into premium equipment.
There are two 2022 XCMG 360E HDD rigs.
60 drill pipes with a diameter of 114 mm; reamers (400, 600, 800); pilot drill bits
Equipped with 100 drill pipes, a pilot bit, 300 mm, 400 mm, and 500 mm reamers, and a swivel.
80 drill pipes with a diameter of 102 mm, 4/6/8 reamers, pilot bits, power dividers, and ground anchor plates. In addition, we have another unit of the same model. This one includes approximately 80 pieces of 102 drill pipe, reamers ranging from 5 to 8 inches in diameter, as well as a pilot bit, […]
80 drill pipes with a diameter of 73 mm, a pilot drill bit, a swivel, and reamers ranging from 200mm to 400mm.
ZT32-50F Hydraulic Cylinder-Powered Robotic Arm, Bare Unit
70 drill pipes (2025) with a diameter of 73 mm, 300mm, 400mm, 500mm reamers, guide bits, swivel, GL750.
Equipped with 100 drill pipes with a diameter of 83 mm, a pilot bit, 300 mm, 400 mm, and 500 mm reamers, a swivel.
2022 ZT120/180-metric-ton drill rig (bare machine), with 3,532 hours of actual operating time
This drilling rig is compatible with 4.5-metre drill pipes.
21 years, 160 tonnes of Goodeng; approximately 1,300 hours of operation; 66 sections of 127mm drill pipe; reamers 8 pieces; a pilot bit; a swivel
40 drill pipes, each 9.6 meters long and 127 millimeters in diameter, and one mud pump with a rated flow rate of 2,600 liters per minute
100 pieces of 6-meter 102 drill pipe, 5–12-inch reamers, steering drill head power divider, Jinlaiyuan 10-cubic-meter mud tank, Jinlaiyuan 60-cubic-meter vibrating screen, Leike 1,000-liter-per-minute external pump, two screw motors (102 and 127); reamers: 330–350 (brand new) – 400 – 430 – 450 (brand new).
2022 Drillto ZT42 horizontal directional drilling rig with genuine 1600 working hours. Complete accessories included: 70 pieces of 83×3000 integral drill rods, 300~800mm barrel reamers, pilot drill bits and swivel.
This used Drillto ZT33C horizontal directional drilling rig was manufactured in 2019 with 1800 working hours. It is matched with Dongfeng Cummins power system, equipped with a rated pullback force of 330kN and rated rotary torque of 12000Nm, providing strong power for all kinds of trenchless crossing projects. Complete supporting accessories including drill rods, […]
A 2021 XZ100/150 horizontal directional drilling rig with over 1,000 hours of operation; Equipped with 90 pieces of 127-spec drill pipe, reamers in three sizes (400, 600, and 800), an eagle-claw guide bit, and a power divider, as well as a mud tank, generator, ground anchors, shackle pliers, and U-ring accessories.
The 450T equipped with 100 83-inch drill pipes, reamers, 300-800 guide bits, and a power divider. There is also a 2025 XZ450F, with over 3,20 hours of operating time, equipped with 100 drill pipes, reamers in 4/5/6/7/8, a guide bit and a swivel.
100 drill pipes, 50 of which were purchased in 2025; 3-8 reamer, guide drill bit, and power divider. There is also a 2019 XZ420E, with over 4100 hours of operating time, equipped with 80 drill pipes, reamers in sizes 300–700, a guide bit and a swivel.